Here are a couple of minor requests of mine.
1. If I press Control and click the new test icon in the test manager, it prepends "New" to the test name that it copies. I wish it didn't do that. If I copy several, I end up with "New test", "New New test" and "New New New test". Then I delete all of news. It's a bit of a bother.
2. I have dual monitors. The pop-ups for reports and stuff go to the primary monitor regardless of which monitor PL/SQL Developer is running. I wish it would pop up on the monitor that PL/SQL Developer was running on.
Thanks for considering,
Mike
1. If I press Control and click the new test icon in the test manager, it prepends "New" to the test name that it copies. I wish it didn't do that. If I copy several, I end up with "New test", "New New test" and "New New New test". Then I delete all of news. It's a bit of a bother.
2. I have dual monitors. The pop-ups for reports and stuff go to the primary monitor regardless of which monitor PL/SQL Developer is running. I wish it would pop up on the monitor that PL/SQL Developer was running on.
Thanks for considering,
Mike