Scheduler really simplifies things but there is a show-stopping bug in the Start Date field. This should be a TIMESTAMP(6) WITH TIMEZONE field but is being treated as a DATE. If a job has been defined with a timezone and is then edited, the timezone is discarded and it becomes a UTC -08:00 (for what was US/PACIFIC). Also, the calendar pop-up doesn't support time so if you use it, you lose the time a job is scheduled. These are a MAJOR problems because it means I cannot edit or set up jobs properly with this feature. Please fix ASAP. Thanks.