Hello!
I'm trying to figure out if I can schedule a query to run at a specific time daily, export it to an excel file, and then save it to a network drive. I had seen a forum from 2013 with an older version of PL/SQL developer that this wasn't possible, but wasn't sure if this is possible now in V15. The save to network drive would be a bonus, but not a deal break if it can only save to local C: drive. If it's possible, is it done through DBMS_SCHEDULER ?
Any insight would be greatly appreciated!
				
			I'm trying to figure out if I can schedule a query to run at a specific time daily, export it to an excel file, and then save it to a network drive. I had seen a forum from 2013 with an older version of PL/SQL developer that this wasn't possible, but wasn't sure if this is possible now in V15. The save to network drive would be a bonus, but not a deal break if it can only save to local C: drive. If it's possible, is it done through DBMS_SCHEDULER ?
Any insight would be greatly appreciated!
 
 
		 
 
		 
 
		