Recent content by LCM

  1. L

    Special schedule for a job

    Hi All, I have a DBMS job scheduled to ran every hour (Repeat Interval => FREQ=MINUTELY; INTERVAL=60). I don't want this job to run on Friday 7 AM alone. That run alone should be missed. Is it possible to schedule the job as required? Kindly suggest
Back
Top